The primary objective to build the Kadana Dam on River Mahi was to control floods in the catchment area. It is a frequent occurring in the central Gujarat getting flooded, whenever around 10lakh cusec water is released from the Kadana dam. With heavy rains in the catchment areas of Rajasthan huge quantity of water is being released in the dam. The level in the Kadana dam has rose to 412.75 ft during the monsoon season.